1, Insulated windings, such as the appropriate method should be used to deal with damp insulation resistance 500V megger check winding temperature, when work temperature (70 ℃), should not be less than 0.38 megohms, or should be drying.
2, Is the cable intact? When broken, it should be replaced.
3, If damaged, please contact us for replacement.
When the vibration motor is mounted on the vibration machine, vibration motor bolts must be tightened, you must add spring washers under each nut. The initial operation of the vibration motor, because the run-in bolts, nuts, between the base plane, will reduce the tightening force, appear small loose, it should be the beginning of the operation of the motor bolts tightened several times, once at the beginning of every fastening two weeks after checking the fastening weekly. After installation, based on the average have cable clamping device, cable suspended between the two was the natural state, with a total length of 300-500mm appropriate, natural drape Department curved arc radius reference linear vibration equipment when two vibrating motors work simultaneously, you should check whether the two vibration motors turn opposite. Otherwise, one should change the motor power phase sequence, so that the two vibrating motors turn in the opposite order to ensure uniformity of materials.
